Practical example shows how VALTO360° scales to different tasks. In this example it is unraveled what has to be taken into consideration when setting up the x-ray film development machine.
Briefly, VALTO360° tells what has to be considered, shows the relevant documents and visually where everything is and works as a memo in the introduction.
List of actions and procedures:
- Development machine’s calibration certificate validity, when is it due to perform a new calibration?
- Development machine’s inspection certificate, is the inspection still valid?
- Opening the water faucet for the machine, where is it located? Are there other valves that has to be opened before operating?
- Turning on algae removal machine, where is the switch and where to get more if the container is empty?
- Freshening liquid level check, how to produce more if the materials are low and where the materials are stored?
- Is there still space for more used freshening in the waste containers, where are the full containers taken for recycling and location of the new containers?
- If the machine gives errors, then what do those mean?
Contacting the maintenance personnel diminishes as the instructions and documents can be found directly from the VALTO360° service. Reports and documents are saved in near real-time of the operations and set up to the customer’s system.
Additional information:
Lassi Halme
+358 40 353 3455
lassi.halme@dekra.com